The project consists of building and operating a wind energy project located in Pecineaga, Dobrogea.
Aggregate capacity: 48MW
Mean Wind Speed (105m): 7.7 m/s
Main Wind Direction: In, NW, S
Capacity factor: 36%
Average Net Energy Output: 180450 MWh/y
Full Load Equivalent: 3200 hours/y
Altitude: 80 m asl
Orography: flat
Period of Wind Measurements: 2 Jahre (2009-10)
Met Mast Height/Mean Wind Speed Registered at Respective the Height: 80.9 m/7.2 m/s
Turbine Hub Weight/Wind Speed at the Respective Height: 105 m/7.7 m/s
Number of Nominal Capacity of the Turbines: 2MW
Project Life: 20-25 Jahre.