Overview

Completed 4,720km fly line of gravity and aeromagnetic acquisition. 250 MMBoe (un-risked). Raw free air gravity indicates the existence of a possible mini basin to the NW corner of the survey area.

Concept: drill early structures on the basin margin (Analog: Tullow Ngamia #1, 1 billion BOE and OPIC Benoy #1, TD 3,052m).

imges